Assemble DICM circuit in the boxes

This procedure is important to protect the circuit from damage. Besides that, it will protect all the electronic components and wire's from heat and water and in addition, it will be used to placing the DC gear motor on the top and placing the water sprinkler tank at the side of boxes.  The assembling DICM circuit in the boxes process are shown in picture below:





DICM system (front view) 

* Tools and equipment used:
~ Screw driver
~ Test pen
~ Long nose
~ Soldering iron 
~ screw (set)



No comments:

Post a Comment